Boyle Heights warehouse cleanup halted by solar operator, Lineage says
- Posted on July 4, 2026
- By Los Angeles Times
- 0 Views
- 1 min read
Boyle Heights warehouse cleanup halted by solar operator, Lineage says
Lineage, which operates the facility, accused Altus Power, the solar panel subcontractor whose rooftop equipment is suspected of potentially sparking the June 17 fire, of obstructing demolition efforts.