B.C. terminates agreement with design-build consortium for new Fraser River tunnel
- Posted on June 16, 2026
- By The Toronto Star
- 0 Views
- 1 min read
B.C. terminates agreement with design-build consortium for new Fraser River tunnel
VICTORIA - The B.C. government is terminating its deal with the design-build consortium it had selected to replace the aging George Massey Tunnel beneath the Fraser River in Metro Vancouver,