‘Concrete monoliths’: Residents push back against data centre power poles
- Posted on September 2, 2026
- By The Age
- 0 Views
- 1 min read
In brief
Generating AI summary…
‘Concrete monoliths’: Residents push back against data centre power poles
Jemena wants to replace smaller wooden power poles with five-storey concrete poles in Melbourne’s west. It’s not going well.